Belt length

For a two-pulley conveyor with any number of bend or snub pulleys added as extra length.

Over the lagging.
Gravity take-up: about 2 × the vertical loop plus pulley wraps. Screw take-up: usually 0.
Fabric step splice on 600–1 200 mm belts: about 0.8–1.5 m. Ask your splicer.
Optional, for the roll weight.
Length to order–m
Around two pulleys
– m
With take-up and splices
– m
Belt area
– m²
Belt mass
– kg

Ordering a replacement belt means getting the length right the first time: too short and the take-up runs out of travel, too long and you pay for belt that ends up as offcut. For a conveyor with a head and tail pulley, the length follows from the centre distance and the two pulley diameters, plus allowances for the take-up and splice.

The belt length formula

For an open belt around two pulleys: L = 2C + π(D1 + D2) ÷ 2 + (D1 − D2)² ÷ 4C, where C is the centre distance and D1, D2 the pulley diameters over lagging, all in metres.

The last term is tiny unless the centres are short and the pulleys very different. On real conveyors the belt also wraps bend, snub and take-up pulleys, so add their extra length from the drawings, or measure the belt path with a tape on a stopped and isolated conveyor.

Take-up and splice allowances

  • Splice: a fabric belt's step splice overlaps the two ends by roughly (plies − 1) × step length + 0.3 × width for the bias. A 1 200 mm, four-ply belt typically needs 1.2 to 1.6 m. Steel-cord splices are longer, often 2 to 4 m, and mechanical fasteners need almost none.
  • Take-up: a new belt stretches. Fabric EP belts take about 1 to 1.5 % of their length in permanent stretch, steel-cord belts about 0.2 %. The take-up must have enough travel for that, so the belt is cut with the take-up close to its starting position.
  • Spare: many buyers order one or two metres extra to allow for a second attempt at a splice.

Our belt splicing page explains hot and cold splices; the roll calculator tells you how big and heavy the delivered roll will be.

Worked example

A conveyor with 50 m centres, a 630 mm head pulley and a 500 mm tail pulley: 2 × 50 + π × (0.63 + 0.5) ÷ 2 + (0.13)² ÷ 200 ≈ 101.78 m. Add 4 m for a gravity take-up loop and 1.2 m for one splice: about 107 m to order.

Frequently asked questions

How do I measure an existing belt's length?
With the conveyor stopped, isolated and locked out, run a measuring wheel or tape along the belt's full path, or mark the belt and count how long one revolution takes at a known speed (length = speed × time). Many splicers measure for you when they quote.
Does belt length include the splice?
The formula gives the endless running length. The cut length you buy is longer by the splice overlap, so add one splice allowance per splice.
Should I buy one long roll or several shorter ones?
A single length means one splice and less downtime, but large rolls need cranes and can be too big for site access. Long belts are often delivered in two or more rolls and spliced in place.