Belt speed sets a conveyor's capacity and drive power, and suppliers need it to quote a new belt, drive, pulley or idler set. On an existing conveyor you can work it out from the drive train: the motor speed, the gearbox ratio and the diameter of the drive pulley including its lagging.
The belt speed formula
v = π × D × n ÷ 60, where v is belt speed in m/s, D the effective drive pulley diameter in metres and n the drive pulley speed in rpm.
- Pulley speed n = motor speed ÷ total reduction ratio. With a variable speed drive, motor speed scales with frequency: a 1 480 rpm motor at 40 Hz turns at about 1 184 rpm.
- Effective diameter D = shell diameter + 2 × lagging thickness. A worn 12 mm lagging on a 630 mm pulley makes almost 4 % difference to belt speed.
- Strictly, the belt's neutral axis sits inside the carcass, so a thick belt runs slightly faster than this figure. The difference is small (under 1 % on most belts).
Checking speed on site
The motor nameplate gives full-load speed, not synchronous speed, and a lightly loaded motor turns slightly faster. To measure the real speed, mark the belt and time one full revolution, then divide the belt length by the time. A hand-held tachometer with a contact wheel on the return belt is quicker. Only do either with the conveyor's guards in place and under your site's safety rules: never reach into a running conveyor.
Typical belt speeds
- Light packaging and assembly lines: 0.1 to 0.5 m/s
- Feeder belts under hoppers and bins: 0.3 to 1 m/s
- Cement, fly ash and other fine, dusty material: 1 to 1.5 m/s
- Aggregate, sand and quarry belts: 2 to 3 m/s
- Coal and ore plant belts: 2.5 to 4.5 m/s
- Long overland and in-pit steel-cord conveyors: 4 to 6 m/s
See the bulk material reference for speed limits by material.
Frequently asked questions
How do I convert ft/min to m/s?
Can I speed up a conveyor with a VSD?
Why is my belt speed different from the design figure?
Get quotes for what you have sized
Used the figures above to size a belt, drive or conveyor? Press Ask for quotes with these figures in the calculator and they are copied into the quote form at the bottom of this page. A supplier or contractor who works in your area replies directly.
- CP-07Conveyor Drives and MotorsSquirrel-cage motors, drum motors and geared units
- CP-03Conveyor Pulleys and LaggingDrive, tail, bend, snub, take-up and wing pulleys
- EQ-01Conveyor SystemsBelt, roller, mobile, stacker and modular plastic conveyors
- CP-01Conveyor RollersShell diameters 89, 102, 127, 152 and 178 mm
More calculators and guides
- TL-01Conveyor Capacity CalculatorTonnes per hour from belt width, speed, trough angle and material
- TL-03Conveyor Power CalculatorDrive power, effective tension and a minimum belt rating
- TL-04Belt Length CalculatorEndless belt length from pulley centres and diameters, plus splice
- TL-05Belt Roll CalculatorRoll length from diameter, roll diameter from length, and roll mass
- TL-06Belt Specification DecoderWhat EP630/4 6+2 M or ST1600 8+6 X means, with tension and pulley size
- TL-07Bulk Material ReferenceDensities, surcharge angles, maximum inclines and belt speeds
- TL-08Conveyor Unit ConverterInches, ft/min, stph, PIW, hp and lb/ft³ to metric and back