Get quotes
TL-03, free tool

Conveyor Drive Power Calculator

A first estimate of the power a belt conveyor needs, from the tonnage, belt speed, length and lift. It also gives the effective tension and a minimum carcass rating to discuss with your supplier.

Drive power and tension

An early-stage estimate for budget quotes and checking an existing drive.

From the capacity calculator if you don't know it.
About 9 for EP400/3 5+1.5, 15 for EP630/4 6+2, 30 for ST1600 8+6. See the decoder.
Carry and return idler rolls per metre of conveyor.
Motor and gearbox together, typically 88–94 %.
Motor power, estimated–kW
Next standard motor
– kW
Power at drive pulley
– kW
Effective tension Fu
– kN
Of which lift
– kN
Tight-side tension T1
– kN
Slack-side tension T2
– kN
Load on belt
– kg/m
Minimum belt rating
– N/mm
Suggested fabric class
–

When you replace a drive, add length to a conveyor or push more tonnes over it, the first questions are how many kilowatts it needs and whether the belt is strong enough. This calculator gives a first estimate using the DIN 22101 / ISO 5048 C-factor method, the same starting point engineers use before a detailed design.

How the estimate works

The effective tension at the drive pulley is the sum of the main resistances and the lift:

FU = C × f × L × g × [mR + (2 mG + mL) cos δ] + H × g × mL

  • mL, the load per metre = capacity ÷ (3.6 × speed)
  • mG, belt mass per metre, and mR, rotating mass of carry and return idler rolls per metre
  • f, the artificial friction coefficient (0.020 for a normal conveyor), and C, a length factor that covers secondary resistances at the loading point, pulleys and cleaners (large on short conveyors, close to 1 on long ones)
  • H, the net lift. Power at the drive pulley = FU × v; motor power divides by the drive efficiency.

The drive can only transmit FU without slipping if T1 / T2 ≤ eμθ (Euler-Eytelwein), with μ the friction between belt and pulley and θ the wrap angle. The slack side must also be tight enough to keep belt sag between idlers to about 1 %. The higher of those two sets T2; T1 = T2 + FU.

From tension to belt rating

The minimum belt rating is the tight-side tension per mm of belt width times a safety factor. Fabric belts are commonly specified with a factor of about 10 to cover splice strength, starting and ageing; steel-cord belts with about 6.7. A result of 283 N/mm means an EP315 belt at minimum, and many buyers would choose EP400 for a margin on splices and starts. Ply count then follows from troughability, impact and pulley diameters, which your supplier will check.

What this estimate leaves out

  • Starting and stopping: acceleration adds tension, which is why soft starts, fluid couplings and VSDs matter on long or steep belts.
  • Special resistances: long skirt boards, ploughs, belt turnovers, trippers and tilted idlers.
  • Horizontal curves, multiple drives and take-up location.
  • Material-specific effects, such as sticky ore or a very cold start in a Highveld winter.

For a new or modified conveyor, ask for a design check with your quote. Most conveyor system suppliers and drive suppliers do this as part of the quotation.

Frequently asked questions

How many kW does a 100 m conveyor need?
It depends mostly on tonnage and lift. A level 100 m conveyor carrying 300 t/h at 2 m/s on a 750 mm belt needs roughly 6 kW at the motor; add 5 m of lift and it needs about 10 kW. Enter your own figures above.
Why does the calculator recommend a bigger motor than the result?
Motors come in standard IEC sizes. The calculator picks the next standard size with at least 5 % margin. Designers often add more for starting torque, future tonnage or a higher friction factor in winter.
What is a holdback?
A backstop on the drive pulley or gearbox that stops a loaded inclined belt from running backwards when power is lost. Any loaded incline conveyor needs one.
Can I use this for a downhill conveyor?
It shows when a downhill belt becomes regenerative (the load drives the belt), but braking, control and run-away protection need a proper design. Treat the figure as an order of magnitude only.

Get quotes for what you have sized

Used the figures above to size a belt, drive or conveyor? Press Ask for quotes with these figures in the calculator and they are copied into the quote form at the bottom of this page. A supplier or contractor who works in your area replies directly.

More calculators and guides

Get free quotes