Capacity is the first number in any conveyor design and the first thing a supplier asks when you request a new belt or system. It depends on how much material sits on each metre of belt (the load cross-section) and how fast the belt runs. The calculator above uses the method in ISO 5048 and DIN 22101, which most South African designers and belt suppliers work to.
How conveyor capacity is calculated
The volume flow is Qv = 3 600 × A × v × k in m³/h, where A is the load cross-section in m², v the belt speed in m/s and k a reduction factor for incline. Multiply by the bulk density in t/m³ to get t/h.
- Loaded width b: the load never reaches the belt edge. For belts up to 2 000 mm, b = 0.9 B − 0.05 m; for wider belts, b = B − 0.25 m.
- Cross-section A is the trough part (between the wing rolls) plus the surcharge part (the heap on top). The trough part grows with the trough angle and the centre roll length; the surcharge part grows with the material's surcharge angle.
- Incline factor k: on a slope the heap flattens. k = 1 − (Asurcharge / A)(1 − k1), with k1 from the incline and surcharge angles.
Centre roll lengths follow ISO 1537 idler sets. SANS 1313 rolls are similar; if your idlers have a much longer or shorter centre roll the trough area changes a little.
Worked example
A 1 200 mm belt on 35° three-roll idlers, running at 2.5 m/s and carrying crushed aggregate (1.5 t/m³, 20° surcharge) on the level:
- Loaded width b = 0.9 × 1.2 − 0.05 = 1.03 m, centre roll about 465 mm
- Cross-section A ≈ 0.165 m²
- Volume = 3 600 × 0.165 × 2.5 ≈ 1 485 m³/h
- Capacity ≈ 1 485 × 1.5 ≈ 2 230 t/h at full section, or about 1 780 t/h at an 80 % design fill
Choosing speed, width and trough angle
- Speed: higher speed gives more tonnage on a narrower, cheaper belt, but increases wear at the loading point, dust, noise and degradation of friable material. Coal and ore belts commonly run at 2.5 to 4.5 m/s, aggregate at 2 to 3 m/s, cement and fly ash at 1 to 1.5 m/s.
- Width: set by both tonnage and lump size. Allow at least three times the largest lump for a well-graded feed, five times when the feed is mostly lumps.
- Trough angle: 35° is the usual choice for bulk mining belts. 45° carries more but needs a belt with good troughability; 20° suits thick or steel-cord belts that will not trough deeply.
- Fill: designing at full section leaves no margin for surges from a crusher or reclaimer. A 75–85 % design fill is common.
Frequently asked questions
What capacity does a 600 mm conveyor belt carry?
Which surcharge angle should I use?
Is this the same as the CEMA method?
Why does my conveyor carry less than the calculation?
Get quotes for what you have sized
Used the figures above to size a belt, drive or conveyor? Press Ask for quotes with these figures in the calculator and they are copied into the quote form at the bottom of this page. A supplier or contractor who works in your area replies directly.
- EQ-01Conveyor SystemsBelt, roller, mobile, stacker and modular plastic conveyors
- BL-10Conveyor Belt Types and SizesTextile EP/NN belts to SANS 1173, steel-cord to SANS 1366
- BL-07Mining Conveyor BeltsTextile EP belts to SANS 1173, steel cord to SANS 1366
- CP-02Conveyor IdlersTroughing sets at 20, 35 and 45 degrees
- BL-01Conveyor BeltingTextile EP and NN belting to SANS 1173, steel cord to SANS 1366 and ISO 15236
More calculators and guides
- TL-02Belt Speed CalculatorBelt speed from motor rpm, gearbox ratio and drive pulley diameter
- TL-03Conveyor Power CalculatorDrive power, effective tension and a minimum belt rating
- TL-04Belt Length CalculatorEndless belt length from pulley centres and diameters, plus splice
- TL-05Belt Roll CalculatorRoll length from diameter, roll diameter from length, and roll mass
- TL-06Belt Specification DecoderWhat EP630/4 6+2 M or ST1600 8+6 X means, with tension and pulley size
- TL-07Bulk Material ReferenceDensities, surcharge angles, maximum inclines and belt speeds
- TL-08Conveyor Unit ConverterInches, ft/min, stph, PIW, hp and lb/ft³ to metric and back